Landlord approval and municipal approval
A landlord’s consent does not replace the applicable municipal process, and a permit does not settle lease obligations.
Keep both sets of requirements visible in the programme. Ask for current fit-out rules, drawing requirements and base-building contacts. Record who submits each package and who can authorise revisions. This avoids treating one approval email as permission for every connected task.
Bring these details into the conversation
- Collect written landlord requirements
- List authority submissions separately
- Keep approved revisions coordinated
Prepare the actual project information
Local requirements depend on the address, existing building and proposed work. Gather the available drawings, a clear description of the intended use and photographs that show the relevant conditions. Use those facts when discussing the project with the municipality and appropriate advisers.
Keep approvals connected to the work
Confirm who will prepare documents, submit applications and coordinate any required inspections. Keep the current approved information available during construction, and review changes before assuming an earlier approval covers a revised proposal. Business contact hours do not override permitted construction hours.